• The Union Cabinet approved the Scheme for Enhancement of Construction and Infrastructure Equipment (CIE) Manufacturing Ecosystem with a financial outlay of Rs 11,000 crore.
• The scheme will be implemented by the Ministry of Heavy Industries (MHI).
Significance of this scheme
• India’s CIE industry is currently the world’s third largest, after China and the United States, with a market size of around Rs 97,500 crore in FY 2024-25.
• Driven by accelerated growth in infrastructure (roads and ports) and housing, the industry is projected to increase more than double, reaching a market size of around Rs 2,28,100 crore by FY 2029-30.
• This initiative by the government of India is a landmark step towards strengthening the domestic CIE manufacturing ecosystem and enhancing competitiveness in the global markets.
• By fostering indigenous capabilities in manufacturing of CIE, the scheme will ensure supply chain security, increase opportunities for employment.
Highlights of the scheme:
• The scheme aims to incentivise manufacturing of technologically advanced equipment such as ship-to-shore cranes, tunnel boring machines, hydraulic excavators, off-highway trucks, etc.
• It also provides for establishing a state-of-the-art, dedicated CIE testing facility in the country.
• The scheme has a duration of eight years from FY 2026-27.
• It includes a two-year gestation period (FY 2026-27 to FY 2027-28) to set up manufacturing facilities, followed by a five-year incentive disbursement period (FY 2028-29 to FY 2032-33) and a final year (FY 2033-34) to settle incentives for incremental sales made in FY 2032-33.
The scheme has two components:
i) Sales-linked Incentive: Incentives will be provided on the incremental sales value of eligible CIE equipment and components to approved applicants across two categories — eligible OEMs and component manufacturers. Graded incentive rates range from 13 per cent to 8 per cent of incremental sales value over a five-year period.
ii) Grant for CIE Testing Facility: A grant of up to Rs 375 crore, in the nature of Viability Gap Funding, for setting up a dedicated CIE testing facility.